AY Villa & Selton Music Academy Inc.

SHAH ALAM SELANGOR

UNILION DEVELOPMENT GROUP INC.
Venture Capital Corporate Partner
Foreign Direct Investment

YIK SANG UNITED SDN BHD
Project Management and Builder

The next revolution of living lifestyles, seven major of the basic necessities of life; Clothing, Food, Shutter, Traffic, Education, Amusement & Medical.

This project is an opportunity to create an enjoyable and sustainable living environment while providing a higher standard of living lifestyle.

The safety and well being of residents and property is of paramount importance. The entire development is gated and guarded and boasts the following security elements:
* Guarded and gated.
* Vehicle access control.
* Fiber optic fence protection system, CCTV and motion detection.
* Alarm system with intercom link to central guardhouse.
* Integrated perimeter security to detect climbing & cutting.
* Internal 24-hour security patrol.

The design intent; Bungalow, Landscape, Sport & Leisure, Office & Convention Center, Auditorium, Waterfall & Pond, Swimming Pool, Large Car park, Music Education Center, Healthcare, Guess Hostel and Cafeteria creates as a ‘green’ working and living environment.

A small pond is constructed in the surrounding of the auditorium to collect rainwater from the roof structure, this allows water to be conserved and recycled and helping to achieve zero rainwater run-off. In mining and heavy equipment in the architecture and facade design, the complex takes on a ‘chunky’ from with angular edges and reflective surfaces.

It features integrated applications such as a passive building envelope, energy-efficient LED lighting technology, Thermally Activated Building Systems (TABS) combined with geothermal source heat pump, and renewable energy supplying by photo voltaic systems.

Surface heating and cooling system will provide a pleasant room climate during all seasons these fresh and preheated airs is supplied by centrally controlled air-conditioner.

By using a real-time Energy Monitoring System, building performance will be recorded continuously. The aim of zero consumption can be shown from these data. The overall concept and integrated planning also mean that initial investments in this sustainable construction will be redeemed within a few years.